Site visiting, waste sampling & analysis
Hazardous waste samples are collected from the generator's site and analyzed through a NABL / ISO certified laboratory.
A six-stage operating system from site sampling to manifest closure—every movement documented and compliant.
Hazardous waste samples are collected from the generator's site and analyzed through a NABL / ISO certified laboratory.
All required legal and regulatory documents are submitted to the waste generator for review and compliance.
MOU is generated between the generator and facilitator.
Vehicles are placed as per the agreed schedule, equipped with an AIS-140 GPS-enabled tracking system.
Each consignment is loaded strictly under manifest compliance and sent for principal approval.
The duly signed manifest copy is handed over to the generator after unloading for principal approval.